Wednesday, May 27

    Upgrade and Refurbishment of Winburg Water Treatment Works

    Tender Overview

    • Tender Number: VCW410/WINWTW/25
    • Project: Upgrade and Refurbishment of Winburg Water Treatment Works
    • Client: Vaal Central Water
    • Location: Winburg
    • Province: Free State
    • Closing Date: 19 June 2026
    • Closing Time: 12:00

    Tender Categories

    • Water Treatment Equipment, Supplies and Services
    • Wet Services / Water and Sanitation
    • Pumps, Valves, Pipes and Meters
    • Repair, Service and Maintenance of Machinery and Equipment

    Project Objective

    The objective of this project is to upgrade and refurbish the Winburg Water Treatment Works to improve:

    • Water treatment capacity
    • Operational reliability
    • Process efficiency
    • Regulatory compliance
    • Asset lifespan
    • Water quality standards

    The project includes extensive civil, mechanical, electrical, instrumentation, control, and ancillary infrastructure improvements.

    Scope of Works

    1. Civil Engineering Works

    The civil component includes:

    Site Preparation

    • Site establishment
    • Site clearance
    • Temporary works
    • Construction access arrangements

    Earthworks

    • Excavation
    • Trenching
    • Backfilling
    • Compaction
    • Bulk earthworks

    Structural Construction

    • New reinforced concrete structures
    • Foundations
    • Retaining structures
    • Equipment plinths
    • Valve chambers
    • Pipe supports

    Building Refurbishment

    • Renovation of existing buildings
    • Waterproofing works
    • Roofing repairs
    • Internal and external finishes
    • Structural repairs

    External Works

    • Paving
    • Walkways
    • Drainage systems
    • Site fencing
    • Access roads

    2. Mechanical Engineering Works

    The mechanical scope includes:

    Pumping Systems

    • Installation of new pumps
    • Refurbishment of existing pumps
    • Pump station upgrades
    • Associated pipework

    Water Treatment Equipment

    • Filters
    • Mixers
    • Valves
    • Flow-control equipment
    • Mechanical process equipment

    Piping Systems

    • New pipelines
    • Pipe modifications
    • Pipe supports
    • Connections to existing infrastructure

    Sludge Handling Facilities

    • Refurbishment of sludge ponds
    • Mechanical upgrades
    • Associated process improvements

    3. Electrical Engineering Works

    The project requires installation and upgrading of:

    Power Systems

    • Electrical reticulation
    • Power distribution systems
    • Cable installations
    • Earthing systems

    Control Equipment

    • Motor Control Centres (MCCs)
    • Distribution boards
    • Electrical panels
    • Switchgear

    Plant Electrical Infrastructure

    • Motors
    • Pump controls
    • Electrical protection systems
    • Emergency systems

    4. Instrumentation and Control Systems

    The contractor will install and commission:

    Monitoring Equipment

    • Flow meters
    • Level transmitters
    • Pressure sensors
    • Process instrumentation

    Automation Systems

    • Telemetry systems
    • Control systems
    • Data acquisition systems
    • Remote monitoring equipment

    Process Control

    • Automated plant control
    • Instrument calibration
    • System integration
    • Operational optimisation

    5. Ancillary Infrastructure

    Additional works include:

    • Refurbishment of buildings
    • Pump station improvements
    • Safety installations
    • Security infrastructure
    • Site services
    • Utility connections
    • Operational support facilities

    Testing and Commissioning

    The successful contractor will be responsible for:

    • Factory acceptance testing (where applicable)
    • Site testing
    • Equipment commissioning
    • System integration testing
    • Functional performance testing
    • Calibration of instruments
    • Defect correction
    • Final handover documentation

    Health, Safety and Environmental Requirements

    The contractor must:

    Occupational Health and Safety

    • Develop and implement a Health and Safety Plan.
    • Appoint competent safety personnel.
    • Conduct risk assessments.
    • Ensure legal compliance with construction regulations.

    Environmental Management

    • Implement environmental management measures.
    • Control pollution and waste.
    • Protect surrounding natural resources.
    • Manage construction impacts.

    Quality Assurance

    • Implement quality control procedures.
    • Maintain inspection records.
    • Comply with project specifications and standards.

    Minimum Qualification Requirements

    CIDB Requirements

    Contractors must possess a minimum:

    CIDB Grading

    • 7 EP (Electrical Engineering Works), or
    • 7 ME (Mechanical Engineering Works),
    • Or a higher equivalent grading.

    Required Professional Resources

    The tender requires access to suitably qualified personnel such as:

    Engineering Professionals

    • Professional Engineer (Pr Eng)
    • Professional Engineering Technologist (Pr Tech Eng)

    Project Personnel

    • Project Manager
    • Construction Manager
    • Site Agent
    • Site Supervisors
    • Quality Control Personnel
    • Health and Safety Officer

    Technical Specialists

    • Mechanical Technicians
    • Electrical Technicians
    • Instrumentation Technicians
    • Commissioning Specialists

    Essential Contractor Experience

    Bidders should demonstrate proven experience in:

    • Water treatment plant construction
    • Water treatment plant upgrades
    • Pump station construction and refurbishment
    • Mechanical process installations
    • Electrical reticulation projects
    • Instrumentation and control systems
    • Municipal infrastructure projects
    • Commissioning of treatment facilities

    Experience on similar large-scale water infrastructure projects will be a significant advantage.

    Compliance Requirements

    The successful bidder must be:

    Supplier Registration

    • Registered on the Central Supplier Database (CSD).

    Regulatory Compliance

    • Tax compliant.
    • Labour law compliant.
    • Occupational Health and Safety compliant.

    Transformation Compliance

    • Compliant with applicable B-BBEE requirements.
    • Submit required empowerment documentation.

    Recommended Supporting Documents

    Typically, bidders should include:

    • CSD Registration Report
    • Tax Compliance Status PIN
    • CIDB Certificate
    • Company Registration Documents
    • B-BBEE Certificate/Affidavit
    • Professional Registration Certificates
    • Project Methodology
    • Construction Programme
    • Quality Management Plan
    • Health and Safety Plan
    • Organogram and CVs of Key Personnel
    • Similar Project Reference Letters
    • Financial Statements (if required)

    Suitable Contractors

    This tender is particularly suitable for:

    • Water infrastructure contractors
    • Civil engineering contractors
    • Mechanical engineering contractors
    • Electrical engineering contractors
    • EPC (Engineering, Procurement and Construction) contractors
    • Water treatment specialists
    • Process engineering contractors
    • Infrastructure development companies

     

    APPLY NOW:

    ALSO SEE:

    Share.