Thursday, November 26

    Test and Repair of 25mm² Underground Cable at Wepener Magistrate Court

    Tender Details

    • Tender Title: Test and Repair of 25mm² Underground Cable at Wepener Magistrate Court

    • Tender Number: ID-3300430

    • Department: Department of Public Works and Infrastructure

    • Required At: Wepener Magistrate Court

    • Location: Wepener, Free State

    • Province: Free State

    • Tender Category: Electrical Cable Supplies, Installation and Maintenance, Electrical Services

    • Required CIDB Grading: 1 EB

    • Contract Period: 3 Days

    • Briefing Meeting: Refer to the tender documentation.

    • Closing Date: 24 November 2026

    • Closing Time: 11:00

    • Submission Method: Physical delivery or postal submission.

    Tender Description

    The Department of Public Works and Infrastructure invites suitably qualified electrical contractors to submit quotations for the testing and repair of a damaged 25mm² underground electrical cable at Wepener Magistrate Court in the Free State.

    The appointed service provider will be responsible for identifying the cable fault, supplying and installing the required replacement cable and jointing materials, conducting electrical tests and restoring the installation to full operational condition.

    The project also requires the successful contractor to provide a detailed technical report, including photographic evidence of the work completed.

    Scope of Work / Key Responsibilities

    The successful service provider will be responsible for the following:

    1. Cable Fault Investigation

    • Conduct underground cable fault detection and diagnostic testing.

    • Identify and locate the damaged section of the 25mm² underground cable.

    • Assess the condition of the existing cable and determine the necessary repairs.

    2. Cable Excavation and Repair

    • Excavate the affected area to expose the damaged underground cable.

    • Access and prepare the damaged cable section for repair.

    • Carry out the necessary cable jointing and repair work.

    3. Supply and Installation of Materials

    The contractor must supply and install:

    • 35 metres of 25mm² 4-core SWA control cable.

    • Two 25-core resin/heat-shrink joint kits.

    4. Testing and Commissioning

    • Conduct continuity testing.

    • Perform insulation resistance testing.

    • Carry out functional testing of the generator controls.

    • Verify that the repaired cable is fully operational.

    • Ensure that all electrical work meets the required safety and quality standards.

    5. Site Restoration

    • Backfill the excavated area.

    • Compact the ground after completing the cable repairs.

    • Ensure that the work area is left in a safe and satisfactory condition.

    6. Reporting and Documentation

    • Prepare and submit a comprehensive technical report.

    • Provide before-and-after photographs of the installation.

    • Submit proof of purchase for all materials used.

    • Ensure that unused or redundant materials remain on-site for verification.

    • Provide invoices reflecting actual materials consumed and verified work completed.

    Minimum Requirements

    Interested contractors must meet the following requirements:

    Registration and Qualifications

    • Must hold a valid Electrical Contractor registration letter in terms of Regulation 6(4) of the Electrical Installation Regulations, 2009.

    • The registration letter must be original or certified and issued and stamped by the Department of Employment and Labour.

    • Must provide two additional Electrical Trade Certificates for assistant personnel.

    • Must have a qualified Installation Electrician to carry out electrical work.

    • Mechanical work must be performed by a qualified Artisan/Tradesman.

    • Must meet the required CIDB grading of 1 EB.

    Experience and Technical Capacity

    • Demonstrate experience in similar underground cable repair and electrical projects.

    • Provide verifiable references for comparable projects completed within the past 5–10 years.

    • Have the necessary tools, equipment and technical personnel to complete the work.

    • Demonstrate the ability to complete the project within the required three-day period.

    • Comply with SABS standards and Department of Public Works specifications.

    Management and Personnel Documentation

    Contractors must provide:

    • Company organogram.

    • CVs of relevant personnel.

    • Certified identity documents.

    • Proof of professional registration for principals, site managers, foremen and technical staff, where applicable.

    • Evidence of adequate staffing and project supervision.

    Mandatory Supporting Documents

    The following documentation is required:

    • Electrical Contractor registration letter.

    • Two additional Electrical Trade Certificates for assistant personnel.

    • CIDB registration documentation.

    • Central Supplier Database (CSD) registration proof.

    • B-BBEE certificate or sworn affidavit.

    • Completed DPW-09 form (Particulars of Tenderer’s Projects).

    • Company organogram and relevant CVs.

    • Certified IDs of relevant personnel.

    • Proof of relevant professional registrations.

    • Health and safety documentation and plans.

    • Security clearance documentation.

    • Proof of adequate insurance coverage.

    Technical and Contractual Requirements

    • All electrical and mechanical work must comply with applicable SABS standards.

    • Contractors must comply with the Occupational Health and Safety Act.

    • Adequate insurance must be maintained for project-related risks.

    • A 2.5% performance security must be provided in the form of a cash deposit, retention or guarantee.

    • The successful contractor must provide photographic evidence of completed work.

    • Proof of purchase must accompany material invoices.

    • Unused materials must remain on-site for inspection and verification.

    Payment Conditions

    Payment based on actual work and materials used

    Payment will be based strictly on the actual materials consumed and work completed and verified on-site.

    Contractors must:

    • Provide proof of purchase for materials.

    • Submit invoices supported by relevant documentation.

    • Leave unused materials on-site for verification.

    • Only claim payment for materials actually used and work performed.

    Evaluation Criteria

    The tender will be evaluated using the 80/20 preference point system:

    • Price: 80 points.

    • Specific Goals: 20 points, including black ownership, female ownership, youth ownership, disability ownership and local municipal presence.

    Submission Details

    Quotation documents may be submitted through either of the following methods:

    Physical Delivery:

    Bid Box
    National Department of Public Works and Infrastructure
    18 President Brand Street
    Bloemfontein
    Free State

    Postal Submission:

    Private Bag X20605
    Bloemfontein
    9301

     

     

    APPLY NOW

    ALSO SEE

    Share.